- Area Size:
- Small areas (10-50 m²) can be completed in a day.
- Medium-sized areas (50-200 m²) may take 1-2 days.
- Large projects (over 200 m²) may take 2-3 days, depending on team size and subfloor condition.
- Team Size:
- A professional and larger team can complete larger areas in a single day.
- Smaller teams may require several days to complete the application.
- Less experienced teams may extend the application process and make mistakes.
- Cleaning and Preparing the Subfloor: 2-6 hours
- Primer (Astar) Application and Drying: 6-12 hours
- Stone Carpet Application: 2-10 hours
- PoreFILLER P-1K Application (for waterproofing): 6-12 hours
- Full Drying Time (for Mechanical Strength): 24-48 hours
Typically, under ideal conditions, a project can be completed within 1-2 days.
- Increasing the team size can shorten application time on larger areas.
- Pre-preparing the subfloor can significantly speed up the application process.
- Taking into account weather conditions and applying at the ideal temperature will optimize curing time.
As a result, Stone Carpet applications are a quick and practical system. With the right team and proper conditions, even large areas can be completed within a single day!